First Responder Radio Coverage — Done Right
The International Fire Code (Section 510) requires approved in-building radio coverage for emergency responders in all new buildings, and many Utah jurisdictions apply it to existing buildings. Where the signal inside falls below the required minimum, an Emergency Responder Radio Coverage System (ERRCS) — a bi-directional amplifier (BDA) and distributed antenna system (DAS) — must be installed. These systems ensure that first responders (police, fire, EMS) can communicate reliably within your building using their radio systems during an emergency.
ERRCS is one of the most misunderstood life safety requirements in Utah — and a common source of late-stage inspection delays. PCS has deep expertise in ERRCS design and installation, and maintains current working knowledge of each Utah jurisdiction's specific frequency requirements and signal strength standards.
PCS installs Nextivity and Potter ERRCS/BDA/DAS systems and works within both manufacturers' licensing programs. We conduct the required in-building radio frequency surveys, design the system to meet minimum signal strength thresholds, and work with the AHJ and the public-safety radio system licensee to obtain the required approvals, while our NICET IV-led fire alarm team handles the supervisory tie-in to the fire alarm panel. We manage the entire process from initial survey through final acceptance testing.
Our Capabilities
- In-building radio frequency (RF) survey and assessment
- ERRCS / BDA system design per IFC 510
- Bi-directional amplifier (BDA) selection and installation
- Distributed Antenna System (DAS) infrastructure
- Donor antenna installation and cable routing
- Coaxial cable and fiber DAS backbone
- Multi-band and wideband system design
- Radio licensee retransmission approval and FCC signal booster registration
- AHJ acceptance testing and documentation
- Annual inspection and testing (IFC 510.6.1)
- Existing building ERRCS assessment and upgrade
- Integration with fire alarm system for power monitoring
The PCS Difference
Utah Jurisdiction Expertise
Each Utah jurisdiction has specific frequency requirements. PCS knows the current requirements for Salt Lake City, Sandy, West Jordan, Provo, and surrounding AHJs.
Nextivity & Potter Systems
We install Nextivity and Potter ERRCS/BDA systems within both manufacturers' licensing programs, and our NICET IV-led fire alarm team handles the supervisory tie-in to the fire alarm panel.
Full Documentation Package
PCS produces the complete documentation package required by Utah AHJs: RF survey results, system design, equipment submittals, and acceptance test reports.
End-to-End Installation
From the donor antenna on the roof to the last DAS antenna on the lowest floor — PCS manages every aspect of the ERRCS installation.
Manufacturers We Install
The ERRCS, BDA, and DAS platforms we install — working within both manufacturers' licensing programs.
Frequently Asked Questions
Ready to Get Started? Let's Talk.
Call us or fill out our project form — we respond within one business day.
Request a Quote (801) 576-6634